Belarus · Minsk Representative

Industrial Basement Waterproofing · Minsk

Underground equipment vault required chemical-resistant waterproofing. Pure polyurea cured in 30 seconds, returning facility to service same-day.

Industrial Basement Waterproofing · Minsk

Customer Type

Industrial Equipment Operator

Industry

Industrial Manufacturing

Project Scale

1,800 m² (floor + walls)

Duration

3 days

The Challenge

Equipment vault experienced water intrusion through cold joints and tie-rod penetrations. Chemical exposure ruled out epoxy systems. Downtime cost $15k/day — needed return-to-service in under 72 hours.

Our Solution

Abrasive blasted to CSP 4. Applied pure polyurea membrane at 2.5mm DFT using JYYJ-H-V8T at 36 MPa with 10-inch PLC precision. Gel time tuned to 8 seconds for vertical work, cure to service in 30 seconds.

What Pioneer Delivered

Not just a machine — a matched system, a trained crew on site, and after-sales backing end to end.

  • On-site survey of the vault — mapping the cold joints and tie-rod penetrations that were the real leak paths and confirming the concrete could be primed damp before any spray.
  • A single-source system — the JYYJ-H-V8T machine and the chemical-resistant pure polyurea matched, tuned to an 8-second gel and warranted together, not equipment and material sourced from three suppliers who blame each other.
  • A spray crew trained for confined-vault vertical and overhead work and fast-gel polyurea — the hard part of waterproofing is laying an even pinhole-free film on walls, and we own it.
  • Holiday-tested QA and a return-to-service plan built around $15k/day downtime — the equipment vault went back to service the same day, saving roughly $30k versus a 3-day epoxy alternative.
  • Ongoing remote support for ratio, temperature and gel-time tuning, plus re-order of the exact matched chemical-resistant polyurea — so the next vault or repair is a phone call, not a new project.

Execution Process

  1. 1 · Abrasive Blasting to CSP 4

    Vault floor and walls are abrasive-blasted to a CSP 4 concrete surface profile, opening the pores and removing laitance, old coatings and contamination. Cold joints and tie-rod penetrations are routed and prepared as the known leak paths.

  2. 2 · Primer & Detail Setup

    A moisture-tolerant primer is applied to the blasted concrete and the routed cold joints and penetrations are detailed to anchor the membrane. The JYYJ-H-V8T is set to 36 MPa with its 10-inch PLC, gel time tuned to 8 seconds for vertical work.

  3. 3 · Pure Polyurea Spray Application

    Spray 2.5 mm DFT of pure polyurea over floor and walls with the JYYJ-H-V8T at 36 MPa, the 8-second gel letting the film build on vertical surfaces without sag. The seamless monolithic membrane bridges every cold joint and tie-rod penetration.

  4. 4 · Cure & Same-Day Return

    The polyurea cures to service in about 30 seconds and the membrane is holiday-tested for pinholes before the vault is signed off. With chemical resistance and over 400% elongation built in, the equipment vault is returned to service the same day.

Key Technical Highlights

Coating System

2.5 mm DFT pure polyurea

Seamless chemical-resistant membrane bridging cold joints and tie-rod penetrations.

Spray Unit

JYYJ-H-V8T @ 36 MPa

High-pressure plural-component rig with 10-inch PLC for precise vertical build.

Gel Time

8 s, tuned for vertical

Fast gel holds the film on walls without sag, then cures to service in 30 seconds.

Surface Prep

CSP 4 + moisture-tolerant primer

Blasted concrete profile and primer anchor the membrane to a damp substrate.

Elongation

>400%

High elongation bridges live movement cracks so leaks do not reopen.

Return to Service

Same day

Cured in seconds, holiday-tested, vault back in service against $15k/day downtime.

Project Gallery

On-site application and finished surfaces from this project.

Industrial Basement Waterproofing · Minsk — on-site view 1

Project Results

Same day

Return to service

polyurea cured in seconds

~$30k

Downtime saved

vs 3-day epoxy alternative

>400%

Elongation

bridges movement cracks

10-year+ rated

Chemical resistance

vs processing chemicals

For Industrial Buyers · Skip the Form

Planning a similar project?

Share your output, voltage, and project scale. Pioneer recommends a matched JYYJ machine + material combination within 24 hours.

✓ ISO 9001 certified plant in China ✓ Reply within 24 hours ✓ TDS · MSDS · COA on request ✓ Mon–Fri 9–18 (UTC+8)

Representative Project: Technical parameters and project outcomes reflect what Pioneer equipment and materials can deliver in similar scenarios. Customer-specific details are held under NDA; full documented case studies available on request.

Get a Quote