Kazakhstan · Almaty Region Representative

500,000-Bird Poultry House Insulation · Almaty Region

Industrial egg-laying poultry · 12,000m² across 8 houses. Stable 18-22°C internal temperature year-round maintained egg production rate above 92% across summer 40°C and winter -25°C extremes.

Customer Type

Industrial Poultry Operation

Industry

Livestock · Poultry

Project Scale

12,000 m² (8 poultry houses)

Duration

22 days

The Challenge

Egg-laying poultry operation faced ±15°C internal temperature swings between summer (40°C ambient) and winter (-25°C ambient), causing egg production drop from 95% to 78% in extreme months. HVAC was largest non-feed expense.

Our Solution

JYYJ-H800 hydraulic spray at 36 MPa with 2-14 kg/min throughput completed 1 poultry house every 3 days, allowing rolling production schedule. Applied 60mm closed-cell PU foam at 36 kg/m³ on roof + walls. Pioneer All-Water A-component with low-odor profile permitted continued operations.

Project Results

18-22°C

Internal temperature stability

year-round (vs ±15°C swing)

92%+

Egg production rate

maintained across seasons

-28%

HVAC energy cost

vs uninsulated baseline

~545 m²/day

Coverage rate

3-person crew · 22-day total

Planning a similar project?

Share your output, voltage, and project scale. Pioneer recommends a matched JYYJ machine + material combination within 24 hours.

Get a Matched Quote

Representative Project: Technical parameters and project outcomes reflect what Pioneer equipment and materials can deliver in similar scenarios. Customer-specific details are held under NDA; full documented case studies available on request.

Get a Quote