Kazakhstan · Almaty Representative

4,200m² Commercial Roof SPF System · Almaty

Logistics warehouse flat roof retrofit. Seamless spray foam roofing with reflective silicone topcoat. Single application replaced torch-on membrane + insulation, eliminated ponding water.

4,200m² Commercial Roof SPF System · Almaty

Customer Type

Logistics / Warehousing Operator

Industry

Logistics

Project Scale

4,200 m²

Duration

11 days

The Challenge

Existing torch-on membrane developed recurring leaks at HVAC curbs. Customer needed weatherproof + insulation upgrade in one system without full tear-off. Winter temperatures demand R-30+ continuous performance.

Our Solution

Applied 60mm closed-cell SPF at 48 kg/m³ over prepped substrate using JYYJ-H800 at 36 MPa. Self-flashed around 32 penetrations. Finished with 30 mil reflective silicone topcoat for UV protection and cool-roof benefit.

What Pioneer Delivered

Not just a machine — a matched system, a trained crew on site, and after-sales backing end to end.

  • On-site roof survey — moisture scan, drain mapping and detailing of all 32 penetrations before spraying — so the new SPF bonds over a sound deck instead of trapping old leaks.
  • A single-source system — the JYYJ-H800 machine, the closed-cell foam and the reflective silicone topcoat matched and warranted together, not waterproofing, insulation and equipment sourced from three suppliers who blame each other.
  • A spray crew trained for flat-roof self-flashing and topcoat consistency — the hard part of SPF roofing is even thickness and clean penetration detailing, and we own it.
  • Flood-test QA and a phasing plan built around the warehouse's operation — 4,200 m² re-roofed in 11 working days with no full tear-off and no shutdown of the logistics floor below.
  • Ongoing remote support for topcoat re-coat scheduling and re-order of the exact matched foam and silicone — so future roof areas or maintenance are a phone call, not a new project.

Execution Process

  1. 1 · Roof Survey & Surface Prep

    The existing torch-on membrane is inspected, wet insulation cut out, and the substrate cleaned and dried so the spray foam bonds over a sound deck. Drains and the 32 penetrations are mapped before any application.

  2. 2 · Setup & Self-Flashing

    The JYYJ-H800 is staged on the roof and set to 36 MPa, with proportioner and hose temperatures dialed in for 48 kg/m3 closed-cell foam. Curbs, drains and the 32 penetrations are pre-detailed so the foam self-flashes each one monolithically.

  3. 3 · SPF Spray Application

    Spray 60 mm of closed-cell SPF at 48 kg/m3 with the JYYJ-H800 at 36 MPa, building a seamless self-flashed membrane that drains to positive slope and eliminates ponding water. A 3-person crew sustains roughly 380 m2 per day.

  4. 4 · Silicone Topcoat & Return

    Once the foam cures, a 30 mil reflective silicone topcoat is sprayed over the full field for UV protection and cool-roof reflectivity. The roof is flood-checked for drainage and handed back ready for service with a continuous R-30+ envelope.

Key Technical Highlights

Coating System

60 mm closed-cell SPF @ 48 kg/m³ + 30 mil silicone

Spray foam insulation and reflective silicone topcoat in one seamless system.

Spray Unit

JYYJ-H800 @ 36 MPa

High-pressure rig sustaining ~380 m²/day with a 3-person roofing crew.

Penetration Detailing

32 self-flashed

Foam self-flashes every curb and penetration — zero membrane seams to fail.

Thermal Performance

R-7 per inch

Closed-cell SPF builds the continuous R-30+ envelope the winters demand.

Ponding Water

Eliminated

Sprayed to positive slope so water drains instead of pooling and re-leaking.

Coverage Delivered

4,200 m² in 11 days

Full retrofit completed without a costly full tear-off of the old roof.

Project Gallery

On-site application and finished surfaces from this project.

4,200m² Commercial Roof SPF System · Almaty — on-site view 1

Project Results

4,200 m²

Coverage area

11 working days

~380 m²/day

Daily output

3-person spray crew

R-7 per inch

R-value achieved

closed-cell insulation

Zero

Penetration failures

self-flashed monolithic membrane

For Industrial Buyers · Skip the Form

Planning a similar project?

Share your output, voltage, and project scale. Pioneer recommends a matched JYYJ machine + material combination within 24 hours.

✓ ISO 9001 certified plant in China ✓ Reply within 24 hours ✓ TDS · MSDS · COA on request ✓ Mon–Fri 9–18 (UTC+8)

Representative Project: Technical parameters and project outcomes reflect what Pioneer equipment and materials can deliver in similar scenarios. Customer-specific details are held under NDA; full documented case studies available on request.

Get a Quote